Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/inspirationconc/public_html/wp-includes/functions.php on line 6114
Case Study| Kinect Wall - Inspiration Concept

case study

jump out robot working, injected our inspiration and concept into each events, in order to full fill customer expectation.

Kinect Wall

a unique opening ceremony in Hong Kong!

an interactive large curtain wall composed of 400 LED walls and motorized components brings a unique opening ceremony for the event, these technique was 1st generation in Hong Kong.

our technical staff stayed in factory for real time trouble shooting, make sure all design dimensions, technical adjustments and production period, with all of the details were completed within 6 months, and the on-site installation time is only 5 days.

time management in a very tight schedule!

modified components and designs completed within 2 weeks. the on-site installation time was only 1 day, and the rehearsal takes place in the evening.

Art Tech

LED Curtain

Rigging + Cyber Hoist

we will help you remains

Inspiration Concept Limited

t : +852 4678 3704

f : +852 3595 2397

a :Flat/ Rm 3, 10/F, Blk. A, 8-10 Wah Sing Street, Kwai Chung, N.T., H.K.

copyright@2024 Inspiration Concept Limited

EN